Q Question 1 10 / 10 pts A job was timed for 60 cycles and had an average of 1.2 minutes per piece. The performance rating was 95 percent, and workday allowances are 10 percent. Determine each of the following: 1. Observed time: minutes (round to one decimal place) 2. Normal time: minutes (round to two decimal places) 3. Standard time: minutes (round to two decimal places) PartialQuestion 2 9 / 10 pts A time study was conducted on a job that contains four elements. The observed times and performance ratings for six cycles are shown in the following table. OBSERVATIONS (minutes per cycle) Element Performance Rating 1 2 3 4 5 6 1 90% 0.44 0.50 0.43 0.45 0.48 0.46 2 85 1.50 1.54 1.47 1.51 1.49 1.52 3 110 0.84 0.89 0.77 0.83 0.85 0.80 4 100 1.10 1.14 1.08 1.20 1.16 1.26 1. Determine the average cycle time for each element. Round to two decimal places. Element 1 minutes Element 2 minutes Element 3 minutes Element 4 minutes 2. Find the normal time for each element. Element 1 minutes Element 2 minutes Element 3 minutes Element 4 minutes 3. Assuming an allowance factor of 15 percent of job time, compute the standard time for this job. Round to two decimal places. Standard time minutes Question 3 10 / 10 pts Given these observed times (in minutes) for four elements of a job, determine the observed time (OT) for each element. Note: The second element only occurs every other cycle. Round to two decimal places. Cycle Element 1 2 3 4 5 6 1 4.1 4.0 4.2 4.1 4.1 4.1 2 - 1.5 - 1.6 - 1.4 3 3.2 3.2 3.3 3.2 3.3 3.3 4 2.7 2.8 2.7 2.8 2.8 2.8 Element 1 minutes Element 2 minutes Element 3 minutes Element 4 minutes Answer 1: Question 4 10 / 10 pts A worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 1.9 minutes per cycle, and the worker was given a rating of 120 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 12 percent of work time, determine the standard time for this job. Round to two decimal places.
View Related Questions